Line 2: Line 2:
  
  
* Recommendations from Director's ReviewElectrical System and Quench Protection and Lehman Review
+
* Recommendations from Director's Review (Electrical System and Quench Protection) and Lehman Review
 
** determine if cold diodes can increase quench detection
 
** determine if cold diodes can increase quench detection
 
** add fast DAQ system prior to testing first coil
 
** add fast DAQ system prior to testing first coil
Line 16: Line 16:
  
 
* Infrastructure
 
* Infrastructure
** get fourth rack, install temporary wheels, bolt to other three racks, install computer and other equipment
+
** get fourth rack, install temporary wheels, bolt to other three racks
 +
** install computer and other equipment
  
  
Line 22: Line 23:
 
* Cryo system
 
* Cryo system
 
** need specs, new channels, new functionality, etc. from Jonathan
 
** need specs, new channels, new functionality, etc. from Jonathan
** Update mechanical/electrical interface drawing
+
** update mechanical/electrical interface drawing
** coils, signals, cryo  update
+
  
  
Line 30: Line 30:
 
** document trip chains
 
** document trip chains
 
** label circuit breakers
 
** label circuit breakers
** use Sequence-Of-Events (SOE) module, need additional wiring and relays
+
** implement Sequence-Of-Events (SOE) module, need additional wiring and relays
 
*** prototype use of SOE module and relays in controls test stand
 
*** prototype use of SOE module and relays in controls test stand
 
** improve voltage range and eliminate cross-talk on voltage tap channels
 
** improve voltage range and eliminate cross-talk on voltage tap channels
Line 36: Line 36:
 
*** change current limiting scheme?
 
*** change current limiting scheme?
 
*** requirements:  fast vs slow, high vs low voltage, high vs low precision
 
*** requirements:  fast vs slow, high vs low voltage, high vs low precision
*** Cody will look into this
+
*** 19 voltage taps, at least two connections/tap, sometimes three
 
+
  
  
 
* Danfysik power supply
 
* Danfysik power supply
 
** use 435NBX to talk to power supply
 
** use 435NBX to talk to power supply
** choose ground fault detection mechanism
+
** implement dump resistor center-tap ground fault detector
 
** lockbox for door key  
 
** lockbox for door key  
 
** lock/tag/try procedures for dump resistor
 
** lock/tag/try procedures for dump resistor
Line 50: Line 49:
  
 
* Quench detector
 
* Quench detector
** can we get a good balance...need sub-coil inductances from Floyd (Fall 2011)
+
** need sub-coil inductances from Floyd/George
** do we need a second QD?  second technology?  do we need to design our own?
+
** do we need a second QD?  second technology?  do we need to design our own?  use PLC?
** can we get an FPGA module with A/D inputs off the shelf to do this?
+
** test imbalance range adjustment in lab
  
  
Line 64: Line 63:
  
  
* VME-based fast DAQ
+
* NI fast DAQ
** NI vs VME?
+
** purchase, implement
** connection to PLC?
+
** connection to PLC, EPICS
** connection to EPICS?
+
  
  
Line 87: Line 85:
 
* A-B PLC programming
 
* A-B PLC programming
 
** consider existing program a prototype, rework for 15-20 year lifetime
 
** consider existing program a prototype, rework for 15-20 year lifetime
** send Josh to A-B training?
+
** send Josh to A-B training
** custom ("add-on") instructions to simplify everything
+
** use custom ("add-on") instructions to simplify everything
 
** use function block, structured text and ladder logic as appropriate
 
** use function block, structured text and ladder logic as appropriate
  

Revision as of 12:44, 29 November 2011

To-do for solenoid controls redesign


  • Recommendations from Director's Review (Electrical System and Quench Protection) and Lehman Review
    • determine if cold diodes can increase quench detection
    • add fast DAQ system prior to testing first coil
    • add tests for internal shorts, shorts to ground and ground faults in coil and power supply to start-up sequence
    • add second dump circuit breaker
    • add additional quench circuit diodes
    • add second quench detector (connected to second dump breaker)
    • add center tap to dump resistor and monitor ground current in the PLC
    • add UPS on dump breakers to avoid fast discharges
    • perform Failure Modes and Effects Analysis (FMEA)


  • Infrastructure
    • get fourth rack, install temporary wheels, bolt to other three racks
    • install computer and other equipment


  • Cryo system
    • need specs, new channels, new functionality, etc. from Jonathan
    • update mechanical/electrical interface drawing


  • Wiring
    • document trip chains
    • label circuit breakers
    • implement Sequence-Of-Events (SOE) module, need additional wiring and relays
      • prototype use of SOE module and relays in controls test stand
    • improve voltage range and eliminate cross-talk on voltage tap channels
      • change connection scheme?
      • change current limiting scheme?
      • requirements: fast vs slow, high vs low voltage, high vs low precision
      • 19 voltage taps, at least two connections/tap, sometimes three


  • Danfysik power supply
    • use 435NBX to talk to power supply
    • implement dump resistor center-tap ground fault detector
    • lockbox for door key
    • lock/tag/try procedures for dump resistor
    • procedures to check for dump resistor integrity and diode polarity prior to startup


  • Quench detector
    • need sub-coil inductances from Floyd/George
    • do we need a second QD? second technology? do we need to design our own? use PLC?
    • test imbalance range adjustment in lab


  • Instrumentation
    • implement system to isolate fault detectors and determine time sequence of trips
    • implement RS232 connections to all devices (e.g. vacuum gauges)
    • Use RTI 435NBX instead of Point I/O serial modules
    • Replace shunt with flux-monitoring sensor


  • NI fast DAQ
    • purchase, implement
    • connection to PLC, EPICS


  • A-B HMI improvements
    • fault sequence screens
    • Viewpoint
      • get screens on the web
      • security?


  • EWEB
    • create tag lists
    • security?


  • A-B PLC programming
    • consider existing program a prototype, rework for 15-20 year lifetime
    • send Josh to A-B training
    • use custom ("add-on") instructions to simplify everything
    • use function block, structured text and ladder logic as appropriate


  • EPICS
    • new channels


  • UPS power
    • solenoid controls racks
    • Danfysik control circuits and contactor?
    • target? other cryo and vacuum systems?
    • cooling systems (dewpoint)?
    • downtime due to power loss is deciding factor



Notes

  • max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec


Possible future improvements

  • monitor selected circuit breakers so operators can quickly find them when they trip