Difference between revisions of "Solenoid Controls Redesign"

From GlueXWiki
Jump to: navigation, search
m
m
Line 61: Line 61:
 
** implement RS232 connections to all devices (e.g. vacuum gauges)
 
** implement RS232 connections to all devices (e.g. vacuum gauges)
 
** Use RTI 435NBX instead of Point I/O serial modules?  Need to get one and test.
 
** Use RTI 435NBX instead of Point I/O serial modules?  Need to get one and test.
 +
** Increase the shunt resistance by a large factor?
  
  

Revision as of 13:43, 18 October 2011

To-do for solenoid controls redesign


  • Address committee concerns
    • dual fast dump switches?
    • other redundancies?
    • UPS on control boards and contactor?
    • what else?


  • Infrastructure
    • what goes into fourth rack besides computer?
    • get fourth rack, install temporary wheels, bolt to other three racks


  • Cryo system
    • need specs, new channels, new functionality, etc.


  • Wiring
    • document trip chains
    • label circuit breakers
    • use Sequence-Of-Events (SOE) module, need additional wiring and relays
      • prototype use of SOE module and relays in controls test stand
    • cross-talk on voltage tap channels
      • change connection scheme?
      • change current limiting scheme?
      • have fast and slow requirements, high and low voltage threshold requirements
        • 10 kHz Dataforth modules? attenuators?
      • discuss with engineers
      • use local measurement and current-loop to bring it down?
    • extend voltage measurement range using attenuators on separate Dataforth/PLC channels
    • should we use high-bandwidth Dataforth modules?
    • should we monitor all relays? circuit breakers?


  • Danfysik power supply
    • do we want to go to Ethernet based control?
    • choose ground fault detection mechanism
    • lockbox for key
    • lock/tag/try for dump resistor
    • procedures to check for dump resistor integrity and diode polarity


  • Quench detector
    • can we get a good balance?
    • need sub-coil inductances in proper order
    • do we need to design our own QD?
    • can we get an FPGA module with A/D inputs off the shelf?


  • Instrumentation
    • implement system to isolate fault detectors and determine time sequence of trips
    • monitor circuit breakers?
    • implement RS232 connections to all devices (e.g. vacuum gauges)
    • Use RTI 435NBX instead of Point I/O serial modules? Need to get one and test.
    • Increase the shunt resistance by a large factor?


  • VME-based fast DAQ
    • NI vs VME?
    • connection to PLC?
    • connection to EPICS?


  • A-B HMI improvements
    • fault sequence screens
    • Viewpoint
      • get screens on the web
      • security?
    • EWEB
      • create tag lists
      • security?


  • A-B PLC programming
    • consider existing program a prototype, rework for 15-20 year lifetime
    • custom ("add-on") instructions to simplify everything


  • EPICS
    • new channels


  • UPS power
    • to where
      • solenoid controls racks
      • target?
    • downtime due to power loss is deciding factor



Notes

  • max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec