Difference between revisions of "Solenoid Controls Redesign"

From GlueXWiki
Jump to: navigation, search
m
m
Line 6: Line 6:
 
** do we want local computer or touch panel?
 
** do we want local computer or touch panel?
 
** do we need new computers?
 
** do we need new computers?
 +
 +
 +
 +
* Cryo system
 +
** need specs, new channels, new functionality, etc.
  
  

Revision as of 14:53, 13 September 2011

To-do for solenoid controls redesign


  • Infrastructure
    • what goes into fourth rack?
    • do we want local computer or touch panel?
    • do we need new computers?


  • Cryo system
    • need specs, new channels, new functionality, etc.


  • Wiring
    • document trip chains
    • label circuit breakers
    • use Sequence-Of-Events (SOE) module, need additional wiring and relays
    • cross-talk on voltage tap channels
      • change connection scheme?
      • change current limiting scheme?
      • use local measurement and current-loop to bring it down?
    • extend voltage measurement range using attenuators on separate Dataforth/PLC channels
    • should we use high-bandwidth Dataforth modules?
    • should we monitor all relays?


  • Danfysik power supply
    • do we want to go to Ethernet based control?
    • choose ground fault detection mechanism
    • address committee concerns
      • dual fast dump switches?
      • other redundancies?
      • UPS on control boards and contactor?
    • lockbox for key
    • lock/tag/try for dump resistor
    • procedures to check for dump resistor integrity and diode polarity


  • Quench detector
    • can we get a good balance?
    • need sub-coil inductances in proper order
    • do we need to design our own QD?


  • Instrumentation
    • implement system to isolate fault detectors and determine time sequence of trips
    • monitor circuit breakers
    • implement RS232 connections to all devices (e.g. vacuum gauges)


  • VME-based fast DAQ
    • NI vs VME?


  • A-B HMI improvements
    • fault sequence screens


  • A-B PLC programming
    • custom ("add-on") instructions to simplify everything


  • EPICS
    • new channels


  • Viewpoint
    • test


  • EWEB
    • use just for back-door access
    • security?


  • UPS power
    • to where
      • solenoid controls racks
      • target?
    • downtime due to power loss is deciding factor



Notes

  • max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec