Difference between revisions of "September 7, 2016 Calibration"

From GlueXWiki
Jump to: navigation, search
(Created page with "GlueX Calibration Meeting<br> Wednesday, August 24, 2016<br> 11:00 am, EST<br> JLab: CEBAF Center, F326 ==Communication Information== ===Remote Connection=== <div class="to...")
 
(Agenda)
Line 65: Line 65:
  
 
# Announcements
 
# Announcements
# Second Production Run
+
#* [https://mailman.jlab.org/pipermail/halld-offline/2016-September/002450.html Second Production Run]
# Fall Run Planning
+
# [[GlueX-Collaboration-Oct-2016|Collaboration Meeting]]
#* Runs
+
# Run Planning
#* fADDC250
+
#* Data taking
 +
#** Cosmic data
 +
#** [[Run_Coordination_Meetings:_Fall_2016_Run#Runplan|Beam data at start of run]]
 +
#* New fADC250 firmware
 
#* ROOT 6 transition
 
#* ROOT 6 transition
 
#* [[Calibration_Train#Fall_2016_Processing|Calibrations to run]]
 
#* [[Calibration_Train#Fall_2016_Processing|Calibrations to run]]
Line 74: Line 77:
 
# Simulations
 
# Simulations
 
#* Data/Simulation comparisons
 
#* Data/Simulation comparisons
 +
#** BCAL (Will M.)
 +
#** FCAL (Adesh)
 +
#** CDC (Mike S.)
 +
#** FDC (Alex A.)
 +
#** Tracking (Paul/Simon)
 +
#** TOF (Beni)
 +
#** SC (Mahmoud)
 
# AOB
 
# AOB

Revision as of 17:50, 6 September 2016

GlueX Calibration Meeting
Wednesday, August 24, 2016
11:00 am, EST
JLab: CEBAF Center, F326

Communication Information

Remote Connection

You can connect using BlueJeans using the meeting number 630 804 895 .       (Click "Expand" to the right for more details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 630804895
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above
    • Use *4 to unmute

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2016 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2016/ .

Calibration Tasks

  1. Spring 2016 Recon Checklist
  2. Mcsmear updates - mcsmear 20160323
  3. Data Validation
  4. GlueX Detector Performance Document

Upcoming Calibrations

  • Updated error matrices
    • BCAL (Mark D.)
    • FCAL (Adesh/Matt)
    • Tracking (Simon)
  • FCAL timing updates (Adesh)
  • Add timing information to FCAL clustering/inner ring calibrations? (Adesh/Matt S.)
  • BCAL TDC calibrations (Andrei)
  • FDC per-channel calibrations (Alex A./Mike S./?)
  • TAGH alignment (Nathan)
  • Tagger energy map (Richard J.?)
  • TOF alignment (Beni/Simon)

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Run Planning
  4. Calibration Updates
  5. Simulations
    • Data/Simulation comparisons
      • BCAL (Will M.)
      • FCAL (Adesh)
      • CDC (Mike S.)
      • FDC (Alex A.)
      • Tracking (Paul/Simon)
      • TOF (Beni)
      • SC (Mahmoud)
  6. AOB