September 30, 2022 Tech group meeting
From GlueXWiki
Revision as of 05:44, 30 September 2022 by Whitey (Talk | contribs) (Created page with "= Meeting Time and Place == Friday September 30, 2022 9:30am TED 2559 and Teams == Agenda == * Safety - ? * Promotion * FCAL2 Schedule * January Schedule ** Get DIRC operat...")
Meeting Time and Place =
Friday September 30, 2022 9:30am TED 2559 and Teams
Agenda
- Safety - ?
- Promotion
- FCAL2 Schedule
- January Schedule
- Get DIRC operational
- Modify Tagger Microscope
- Install New Profiler
- Hall D current Tasks
- FCAL Insert Module fabrication
- brass straps
- matching mu metal to steel shields - 144 steel housings should be annealed
- FCAL2 Design tidbits
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass
- Tungsten
- Insulation
- Electronic patch panels
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks -
- Cooling Manifold arrived and in ESB
- Weld water manifold supports
- Bend/solder copper tubes
- JBweld conductive epoxy tubes to blocks
- HDList updates
- GEM detector install?
- KLONG dwgs
- FCAL Insert Module fabrication
- Controls - Bobbly will be responsible for PLC
- DIRC vacuum pump cooling water off - to install new orifice
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas