Difference between revisions of "September 23, 2009 Software"

From GlueXWiki
Jump to: navigation, search
(Minutes: intermediate)
(Minutes: int.)
Line 44: Line 44:
  
 
'''Position-Dependent Position Resolution''': David has implemented this and checked in the changes, incorporating comments he received at the last [[???|Tracking Meeting]].
 
'''Position-Dependent Position Resolution''': David has implemented this and checked in the changes, incorporating comments he received at the last [[???|Tracking Meeting]].
 +
 +
==Collaboration Meeting Discussion==
 +
 +
We reviewed some [??? discussion items] from the CMU Collaboration Meeting.
 +
 +
* Elton again stress making a prioritized list of tasks for the Offline Group to address.
 +
* Mark reminded us of the item in his [??? concluding slide]: full reconstruction of multi-track, multi-photon events.
 +
* Sascha asked if we have a list of official contact people for the various reconstruction packages. David reminded us that we do; they are listed in the [??? Offline Task List].
 +
* David remarked that we already have full reconstruction capability, but some documentation is needed to make it easier for non-experts. Elton volunteered to act as a beta tester for the GlueX full reconstruction documentation project.
 +
* We agreed that we should discuss priority at the [[???|next Offline Meeting]].
 +
 +
==Steps for Offline Activities==
 +
 +
We reviewed the [[Steps for Offline Activities, 12 Gev Project|list of steps]] that Mark and David recently wrote for some of the official offline activities in the 12 GeV Project<ref>BIA actually.</ref> Earned Value Management System (EVMS) response to a request from Eugene Chudakov. These have been entered into the system. Elton thought we should consider adding these steps to Fastrack??? to track their progress.
 +
 +
==How Timing Is Done in GlueX==
 +
 +
==Deferred Agenda Items==
 +
 +
* [??? Coding standards]: Mark
  
 
==New Action Items==
 
==New Action Items==
Line 50: Line 70:
 
# Complete alternate B-field studies -> David
 
# Complete alternate B-field studies -> David
 
# Add inner plastic cylinder to the CDC geometry -> Beni (SHOULD BE REDUNDANT)
 
# Add inner plastic cylinder to the CDC geometry -> Beni (SHOULD BE REDUNDANT)
 +
# Full reconstruction demonstration project -> Elton and David
  
 
===Notes===
 
===Notes===
  
prioritized list of software topics for next meeting
 
elton g. p. smith multi-track multi-photon events
 
formal list of contact people: see software task list
 
bia fast-trackable, may consider
 
 
.2 prob of having two tagger hits in microscope from the same bucket
 
.2 prob of having two tagger hits in microscope from the same bucket
 
keep truth as pass through thing
 
keep truth as pass through thing

Revision as of 16:47, 24 September 2009

Location

The meeting will be at 2:00 pm in ARC Building, Room 428.

Telephone

To connect by telephone:

  1. dial:
    • 800-377-8846 : US
    • 888-276-7715 : Canada
    • 302-709-8424 : International
  2. enter participant code: 77438230# (remember the "#")

Video Conferencing

A) ESNet: 8542553
B) EVO: direct meeting link

Agenda

  1. Review minutes from last meeting
  2. Announcements
  3. Collaboration meeting comments: all
  4. Steps for Offline Activities, 12 Gev Project: Mark
  5. Coding standards: Mark
  6. How timing is done in GlueX: Craig Bookwalter
  7. FCAL Smearing: David
  8. Action item review

Minutes

Present at JLab: Craig Bookwalter, Mark Ito, David Lawrence, Elton Smith, Sascha Somov, Simon Taylor, Beni Zihlmann

Review of Minutes from the Last Meeting

Access to Mechanical Drawings: Mark will find the message from Chuck announcing new OCE accounts for staff physicists. He will circulate the information and possibly write a wiki page on how to access our drawings.

Additional Disk Space: Beni has been looking at options for purchasing disk storage space in addition to that provided by IT Division. We deferred full discussion to a time when the need for more space is more pressing.

FDC Half-Cell Stagger Studies: Simon has written and posted a [??? GlueX Note]. Mark commented that neighboring wire planes to provide help with the left-right resolution in a particular plane even though their wires are not parallel to the plane in question.

Alternate B-Field Studies: David reports that these are progressing.

Position-Dependent Position Resolution: David has implemented this and checked in the changes, incorporating comments he received at the last Tracking Meeting.

Collaboration Meeting Discussion

We reviewed some [??? discussion items] from the CMU Collaboration Meeting.

  • Elton again stress making a prioritized list of tasks for the Offline Group to address.
  • Mark reminded us of the item in his [??? concluding slide]: full reconstruction of multi-track, multi-photon events.
  • Sascha asked if we have a list of official contact people for the various reconstruction packages. David reminded us that we do; they are listed in the [??? Offline Task List].
  • David remarked that we already have full reconstruction capability, but some documentation is needed to make it easier for non-experts. Elton volunteered to act as a beta tester for the GlueX full reconstruction documentation project.
  • We agreed that we should discuss priority at the next Offline Meeting.

Steps for Offline Activities

We reviewed the list of steps that Mark and David recently wrote for some of the official offline activities in the 12 GeV Project[1] Earned Value Management System (EVMS) response to a request from Eugene Chudakov. These have been entered into the system. Elton thought we should consider adding these steps to Fastrack??? to track their progress.

How Timing Is Done in GlueX

Deferred Agenda Items

  • [??? Coding standards]: Mark

New Action Items

  1. Find Chuck's OCE email -> Mark
  2. Complete alternate B-field studies -> David
  3. Add inner plastic cylinder to the CDC geometry -> Beni (SHOULD BE REDUNDANT)
  4. Full reconstruction demonstration project -> Elton and David

Notes

.2 prob of having two tagger hits in microscope from the same bucket

keep truth as pass through thing
  1. BIA actually.