Sep 27, 2011 Calorimetry

From GlueXWiki
Revision as of 14:26, 27 September 2011 by Elton (Talk | contribs)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
  2. Beam test

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring. Christina cannot participate, but she sent this note;
    • I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
    • I will also send you few slides over the weekend to prsent in the coll.meeting.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  5. BCAL
    1. Construction Status: builds
  6. Simulations/Reconstruction
  7. Timing measurements of SiPMs GlueX-doc-1814 (Elton)
  8. Beam tests in Hall B (fall 2011) (Kei)
    1. Contact with Hall B (Elton)
      • After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
  9. Discussions of presentations at GlueX-Collaboration-Sep-2011
  10. Any other business

Minutes

Attending: Yi, Beni, Tim, Elton, Dave (Jlab); Zisis, Andrei (UofR); Matt, Kei (IU)

  1. Announcements
  2. Review of Action Items
  3. Monitoring. Christina cannot participate, but she sent this note;
    • I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
    • I will also send you few slides over the weekend to prsent in the coll.meeting.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  5. BCAL
    1. Construction Status: builds
  6. Simulations/Reconstruction
  7. Timing measurements of SiPMs GlueX-doc-1814 (Elton)
  8. Beam tests in Hall B (fall 2011) (Kei)
    1. Contact with Hall B (Elton)
      • After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
  9. Discussions of presentations at GlueX-Collaboration-Sep-2011
  10. Any other business