Difference between revisions of "Sep 27, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 27: Line 27:
 
## Construction Status: builds
 
## Construction Status: builds
 
# Simulations/Reconstruction
 
# Simulations/Reconstruction
# Timing measurements of SiPMs (Elton)
+
# Timing measurements of SiPMs [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1814 GlueX-doc-1814] (Elton)
 
# Beam tests in Hall B (fall 2011) (Kei)
 
# Beam tests in Hall B (fall 2011) (Kei)
 
# Discussions of presentations at [[GlueX-Collaboration-Sep-2011]]
 
# Discussions of presentations at [[GlueX-Collaboration-Sep-2011]]

Revision as of 10:17, 27 September 2011

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
  2. Beam test
    • Zisis will start a list of goals and requirements for the Bcal test.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  5. BCAL
    1. Construction Status: builds
  6. Simulations/Reconstruction
  7. Timing measurements of SiPMs GlueX-doc-1814 (Elton)
  8. Beam tests in Hall B (fall 2011) (Kei)
  9. Discussions of presentations at GlueX-Collaboration-Sep-2011
  10. Any other business

Minutes

Attending: