Difference between revisions of "Sep 16, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Tentative Agenda)
Line 24: Line 24:
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
 +
# FCAL
 +
## Notes from Matt: Excellent news on the CW front
 +
##* Paul has a new reel of caps that hold voltage to 3 kV in air (leads soldered directly to to cap). 
 +
##* Under the microscope these look better than old caps -- less "spikey stuff" on the metallization.
 +
##* He fully assembled one multiplier board and powered it up to 2 kV.  It held 2 kV fine without any conformal coating.
 
# Calibration  
 
# Calibration  
 
# BCAL
 
# BCAL
 
## Construction Status
 
## Construction Status
 
# SiPM update
 
# SiPM update
# FCAL
 
## Construction status
 
## To shashlyk or not to shashlyk.
 
 
# Simulations
 
# Simulations
 
# Other Updates
 
# Other Updates

Revision as of 10:55, 16 September 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. Fcal
    • Elton and Ashot to meet and resolve any discrepancies between the simulations.
    • Tim to check on magnetic checks of non-corrosion coated shield.
    • Elton to check what to do with cables that do not meet CL2 specification. Excess? Distribute to collaborating universities?
  3. SiPM decision
    • IU: geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. FCAL
    1. Notes from Matt: Excellent news on the CW front
      • Paul has a new reel of caps that hold voltage to 3 kV in air (leads soldered directly to to cap).
      • Under the microscope these look better than old caps -- less "spikey stuff" on the metallization.
      • He fully assembled one multiplier board and powered it up to 2 kV. It held 2 kV fine without any conformal coating.
  4. Calibration
  5. BCAL
    1. Construction Status
  6. SiPM update
  7. Simulations
  8. Other Updates

Minutes

Attendees: