Difference between revisions of "Sep 16, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Items for followup from previous meeting(s))
Line 15: Line 15:
 
#* <strike> Elton and Ashot to meet and resolve any discrepancies between the simulations. </strike>
 
#* <strike> Elton and Ashot to meet and resolve any discrepancies between the simulations. </strike>
 
#* Tim to check on magnetic checks of non-corrosion coated shield.
 
#* Tim to check on magnetic checks of non-corrosion coated shield.
 +
#* Elton to check what to do with cables that do not meet CL2 specification. Excess? Distribute to collaborating universities?
 
# SiPM decision
 
# SiPM decision
 
#* IU: geometry for summed units
 
#* IU: geometry for summed units

Revision as of 14:19, 2 September 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. Fcal
    • Elton and Ashot to meet and resolve any discrepancies between the simulations.
    • Tim to check on magnetic checks of non-corrosion coated shield.
    • Elton to check what to do with cables that do not meet CL2 specification. Excess? Distribute to collaborating universities?
  3. SiPM decision
    • IU: geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. BCAL
    1. Construction Status
  5. SiPM update
  6. FCAL
    1. Construction status
    2. To shashlyk or not to shashlyk.
  7. Simulations
  8. Other Updates

Minutes

Attendees: