Difference between revisions of "Sep 15, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Documents to Review)
Line 19: Line 19:
  
 
# Please place documents here for review in advance of meeting
 
# Please place documents here for review in advance of meeting
# [[Calibration-Monitoring]]
 
# [http://physics.indiana.edu/~ptsmith/pulseled/ Paul Smith's Fiber Pulser]
 
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 14:03, 2 September 2008

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")


Items for followup from Sep 2 calibration meeting

  1. Each subsystem must complete blanks in specification table.

Items for followup from Aug 18 meeting

  1. George: report on trip to Edmonton
  2. Estimates of pedestal width (electronic noise, etc.) for FM PMTs. The dark rate should be negligigle in this case.
  3. Resolution studies with up-to-date geometry (Blake) ONGOING
  4. Resolution studies with different segmentation for the outer section. - LOWER PRIORITY
  5. Add F100 rad hard glass to simulation. - Matt will do this
  6. Decision on Bcal sampling fraction needed by Sep. - Work by Stamatis (on vacation) will be summarized upon his return.

Documents to Review

  1. Please place documents here for review in advance of meeting

Tentative Agenda

  1. Announcements
  2. Reports
  3. Updates
    • FCAL
    • BCAL
    • calibration
  4. Any other business

Minutes

Attending: