Difference between revisions of "SRC FCAL time/energy calibrations"

From GlueXWiki
Jump to: navigation, search
(Created page with "#Periods #* D, 7 days or periods #* He, 17 days or periods #* C, 19 days or periods #Gain matching calibration plots #* [https://halldweb.jlab.org/primexd/src-he/ He QC/QA] #*...")
 
Line 1: Line 1:
 
#Periods
 
#Periods
 
#* D, 7 days or periods
 
#* D, 7 days or periods
 +
**period 1 / run range: 90207-90208 / number of runs:2
 +
**period 2 / run range: 90209-90225 / number of runs:15
 +
period 3 / run range: 90226-90241 / number of runs:11
 +
period 4 / run range: 90242-90249 / number of runs:8
 +
period 5 / run range: 90558-90571 / number of runs:13
 +
period 6 / run range: 90572-90589 / number of runs:18
 +
period 7 / run range: 90590-90601 / number of runs:12
 +
 
#* He, 17 days or periods
 
#* He, 17 days or periods
 
#* C, 19 days or periods
 
#* C, 19 days or periods

Revision as of 17:24, 12 January 2022

  1. Periods
    • D, 7 days or periods
    • period 1 / run range: 90207-90208 / number of runs:2
    • period 2 / run range: 90209-90225 / number of runs:15

period 3 / run range: 90226-90241 / number of runs:11 period 4 / run range: 90242-90249 / number of runs:8 period 5 / run range: 90558-90571 / number of runs:13 period 6 / run range: 90572-90589 / number of runs:18 period 7 / run range: 90590-90601 / number of runs:12

    • He, 17 days or periods
    • C, 19 days or periods
  1. Gain matching calibration plots
  2. Checking the FCAL gains
  3. Energy dependence correction monitoring plots