Difference between revisions of "Run preparation check list"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
* Move tagger microscope (Tim, eng)
+
# Move tagger microscope (Tim, eng)
  
* Install  plate with TAGH counters (Tim, eng)
+
# Install  plate with TAGH counters (Tim, eng)
  
 
* Connect cables (Nick/Chris)
 
* Connect cables (Nick/Chris)

Revision as of 12:54, 29 July 2022

  1. Move tagger microscope (Tim, eng)
  1. Install plate with TAGH counters (Tim, eng)
  • Connect cables (Nick/Chris)
  • Install fixed TAGH counters (Chris, Sasha)
  • Allign TAGH/TAGM (survey group)