Latest revision as of 13:00, 29 July 2022

  • TAGH / TAGM
  1. Move tagger microscope (Tim, eng)
  2. Install plate with TAGH counters (Tim, eng)
  3. Connect cables (Richard/Nick/Chris)
  4. Install fixed TAGH counters (Chris, Sasha)
  5. Allign TAGH/TAGM (survey group)
  6. Check TAGM / TAGM scalers (Richard/Sasha)
  • CCAL installation
  1. Install CCAL movable platform (Tim, eng)
  2. Install CCAL on the platform (Tim, eng)]
  3. Connect cables (Sasha, Vlad, Arshak, Chris)
  4. Restore slow control (Nick)
  5. Connect cables and check the LMS (Arshak/Sasha)