Difference between revisions of "Run preparation check list"
From GlueXWiki
Line 6: | Line 6: | ||
# Install fixed TAGH counters (Chris, Sasha) | # Install fixed TAGH counters (Chris, Sasha) | ||
# Allign TAGH/TAGM (survey group) | # Allign TAGH/TAGM (survey group) | ||
+ | |||
+ | * CCAL installation |
Revision as of 12:56, 29 July 2022
- TAGH / TAGM
- Move tagger microscope (Tim, eng)
- Install plate with TAGH counters (Tim, eng)
- Connect cables (Nick/Chris)
- Install fixed TAGH counters (Chris, Sasha)
- Allign TAGH/TAGM (survey group)
- CCAL installation