* TAGH / TAGM
 +
 
# Move tagger microscope (Tim, eng)
 
# Move tagger microscope (Tim, eng)
 
 
# Install  plate with TAGH counters (Tim, eng)
 
# Install  plate with TAGH counters (Tim, eng)
 +
# Connect cables (Richard/Nick/Chris)
 +
# Install fixed TAGH counters (Chris, Sasha)
 +
# Allign TAGH/TAGM  (survey group)
 +
# Check TAGM / TAGM scalers (Richard/Sasha)
  
* Connect cables (Nick/Chris)
+
* CCAL installation
 
+
* Install fixed TAGH counters (Chris, Sasha)
+
  
* Allign TAGH/TAGM  (survey group)
+
# Install CCAL movable platform (Tim, eng)
 +
# Install CCAL on the platform (Tim, eng)]
 +
# Connect cables (Sasha, Vlad, Arshak, Chris)
 +
# Restore slow control (Nick)
 +
# Connect cables and check the LMS (Arshak/Sasha)

Latest revision as of 13:00, 29 July 2022

  • TAGH / TAGM
  1. Move tagger microscope (Tim, eng)
  2. Install plate with TAGH counters (Tim, eng)
  3. Connect cables (Richard/Nick/Chris)
  4. Install fixed TAGH counters (Chris, Sasha)
  5. Allign TAGH/TAGM (survey group)
  6. Check TAGM / TAGM scalers (Richard/Sasha)
  • CCAL installation
  1. Install CCAL movable platform (Tim, eng)
  2. Install CCAL on the platform (Tim, eng)]
  3. Connect cables (Sasha, Vlad, Arshak, Chris)
  4. Restore slow control (Nick)
  5. Connect cables and check the LMS (Arshak/Sasha)