− | * | + | * TAGH / TAGM |
− | + | # Move tagger microscope (Tim, eng) | |
+ | # Install plate with TAGH counters (Tim, eng) | ||
+ | # Connect cables (Richard/Nick/Chris) | ||
+ | # Install fixed TAGH counters (Chris, Sasha) | ||
+ | # Allign TAGH/TAGM (survey group) | ||
+ | # Check TAGM / TAGM scalers (Richard/Sasha) | ||
− | * | + | * CCAL installation |
− | + | # Install CCAL movable platform (Tim, eng) | |
− | + | # Install CCAL on the platform (Tim, eng)] | |
− | + | # Connect cables (Sasha, Vlad, Arshak, Chris) | |
+ | # Restore slow control (Nick) | ||
+ | # Connect cables and check the LMS (Arshak/Sasha) |
Latest revision as of 13:00, 29 July 2022
- TAGH / TAGM
- Move tagger microscope (Tim, eng)
- Install plate with TAGH counters (Tim, eng)
- Connect cables (Richard/Nick/Chris)
- Install fixed TAGH counters (Chris, Sasha)
- Allign TAGH/TAGM (survey group)
- Check TAGM / TAGM scalers (Richard/Sasha)
- CCAL installation
- Install CCAL movable platform (Tim, eng)
- Install CCAL on the platform (Tim, eng)]
- Connect cables (Sasha, Vlad, Arshak, Chris)
- Restore slow control (Nick)
- Connect cables and check the LMS (Arshak/Sasha)