# Move tagger microscope (Tim, eng) | # Move tagger microscope (Tim, eng) | ||
# Install plate with TAGH counters (Tim, eng) | # Install plate with TAGH counters (Tim, eng) | ||
− | # Connect cables (Nick/Chris) | + | # Connect cables (Richard/Nick/Chris) |
# Install fixed TAGH counters (Chris, Sasha) | # Install fixed TAGH counters (Chris, Sasha) | ||
# Allign TAGH/TAGM (survey group) | # Allign TAGH/TAGM (survey group) | ||
+ | # Check TAGM / TAGM scalers (Richard/Sasha) | ||
* CCAL installation | * CCAL installation | ||
− | # Install CCAL movable platform | + | # Install CCAL movable platform (Tim, eng) |
− | # | + | # Install CCAL on the platform (Tim, eng)] |
+ | # Connect cables (Sasha, Vlad, Arshak, Chris) | ||
+ | # Restore slow control (Nick) | ||
+ | # Connect cables and check the LMS (Arshak/Sasha) |
Latest revision as of 13:00, 29 July 2022
- TAGH / TAGM
- Move tagger microscope (Tim, eng)
- Install plate with TAGH counters (Tim, eng)
- Connect cables (Richard/Nick/Chris)
- Install fixed TAGH counters (Chris, Sasha)
- Allign TAGH/TAGM (survey group)
- Check TAGM / TAGM scalers (Richard/Sasha)
- CCAL installation
- Install CCAL movable platform (Tim, eng)
- Install CCAL on the platform (Tim, eng)]
- Connect cables (Sasha, Vlad, Arshak, Chris)
- Restore slow control (Nick)
- Connect cables and check the LMS (Arshak/Sasha)