Difference between revisions of "Run preparation check list"
From GlueXWiki
(Created page with "* Move tagger microscope * Install plate with TAGH counters * Install fixed TAGH counters") |
|||
Line 1: | Line 1: | ||
− | * Move tagger microscope | + | * Move tagger microscope (Tim, eng) |
− | * Install plate with TAGH counters | + | * Install plate with TAGH counters (Tim, eng) |
− | * Install fixed TAGH counters | + | |
+ | * Connect cables (Nick/Chris) | ||
+ | |||
+ | * Install fixed TAGH counters (Chris, Sasha) | ||
+ | |||
+ | * Allign TAGH/TAGM (survey group) |
Revision as of 12:53, 29 July 2022
- Move tagger microscope (Tim, eng)
- Install plate with TAGH counters (Tim, eng)
- Connect cables (Nick/Chris)
- Install fixed TAGH counters (Chris, Sasha)
- Allign TAGH/TAGM (survey group)