Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, September 27)
(Monday, September 27)
Line 10: Line 10:
 
#* Swing summary: https://logbooks.jlab.org/entry/3912060
 
#* Swing summary: https://logbooks.jlab.org/entry/3912060
 
#* Friday am to Saturday 8am summary:
 
#* Friday am to Saturday 8am summary:
 +
#** Tagger NMR https://logbooks.jlab.org/entry/3912006
 
#** z position of Be target https://logbooks.jlab.org/entry/3911950
 
#** z position of Be target https://logbooks.jlab.org/entry/3911950
 
#** Remove absorber https://logbooks.jlab.org/entry/3911915
 
#** Remove absorber https://logbooks.jlab.org/entry/3911915
Line 25: Line 26:
 
#* No Beam https://logbooks.jlab.org/entry/3912495 https://logbooks.jlab.org/entry/3912567
 
#* No Beam https://logbooks.jlab.org/entry/3912495 https://logbooks.jlab.org/entry/3912567
 
#* TAGH discriminator scalers in EPICS froze https://logbooks.jlab.org/entry/3912490
 
#* TAGH discriminator scalers in EPICS froze https://logbooks.jlab.org/entry/3912490
 +
#* Bleedthrough
 
# Plan
 
# Plan
  

Revision as of 19:11, 25 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir