Difference between revisions of "Run Planning Meeting Notes, September 22 - September 28, 2022"
From GlueXWiki
(→Issues) |
(→Friday, September 23) |
||
Line 10: | Line 10: | ||
=Friday, September 23= | =Friday, September 23= | ||
*Shift summaries | *Shift summaries | ||
− | **[https://logbooks.jlab.org/entry/ | + | **[https://logbooks.jlab.org/entry/4045490 1600-2000 22/09] |
**[https://logbooks.jlab.org/entry/4045263 1000-1600 22/09] | **[https://logbooks.jlab.org/entry/4045263 1000-1600 22/09] | ||
**[https://logbooks.jlab.org/entry/4045170 0400-1000 22/09] | **[https://logbooks.jlab.org/entry/4045170 0400-1000 22/09] | ||
Line 18: | Line 18: | ||
=== Plan === | === Plan === | ||
+ | |||
=Thursday, September 22= | =Thursday, September 22= | ||
=== Past 24 Hours === | === Past 24 Hours === |
Revision as of 20:21, 22 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, September 23
- Shift summaries
Past 24 Hours
Issues
- Beam y-position (Edy/Hovanes)
Plan
Thursday, September 22
Past 24 Hours
- 12 runs collected totaling 2.1B events collected
- No beam for 1h and 20min
- New Active Collimator Orbit Lock was calibrated successfully
- Shift summaries:
Issues
- DB not up-to-date, no info after 110855 and beam current is wrong for some runs (110846, 110850, & 110855)
- DAQ Stopped Refreshing and Needed to be Restarted (Tyler)
Plan
- Take production data at 200nA with Full target