Difference between revisions of "Run Planning Meeting Notes, September 16 - September 23, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, September 18)
(Saturday, September 18)
Line 45: Line 45:
 
=Saturday, September 18=
 
=Saturday, September 18=
 
# Last 24 hours:  
 
# Last 24 hours:  
#* Tune beam round yesterday noon. Good quality CW into the tagger at 15:00
+
#* AC Fixed at 9:30 am
#** Day Shift summary: https://logbooks.jlab.org/entry/3906056
+
#** Voltage cable was attached but not locked.
#** Swing summary: https://logbooks.jlab.org/entry/3906229
+
# Shift Summary:
#** Owl summary: https://logbooks.jlab.org/entry/3906383
+
#* Day Shift summary: https://logbooks.jlab.org/entry/3906056
 +
#* Swing summary: https://logbooks.jlab.org/entry/3906229
 +
#* Owl summary: https://logbooks.jlab.org/entry/3906383
 
#** Early Riser Summary: https://logbooks.jlab.org/entry/3906545
 
#** Early Riser Summary: https://logbooks.jlab.org/entry/3906545
# HARP Scan results: https://logbooks.jlab.org/entry/3906296
+
 
#* Signal to background too high or pedestal shifted (require adjustment)? : https://logbooks.jlab.org/entry/3906283
+
 
#* Tagger Gamma counter rate comparison: last night vs 2020 for same radiator: https://logbooks.jlab.org/entry/3906326
+
# Overnight: snake scan.  
#* Evident suggest pedestal for the Halo monitor shifted
+
# Present: snake scan ongoing.
#* Empty target run overnight
+
#** Without Active collimator
+
# Report/issue
+
#* AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
+
 
#** Radcon is escorting Nick into the collimator cave for checking
 
#** Radcon is escorting Nick into the collimator cave for checking
 
#* Counting house microphone issue:
 
#* Counting house microphone issue:
#** Improved significantly by the new microphone by Matt
+
#** Good enough for now. Fin tweak needed. Remote shifters: please give feedback.
#** A longer USB to micro USB cable will further improve the remote shift experience
+
 
# Run plan
 
# Run plan
#* [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Run plan]
+
#* TAGM checkout to be completed (Richard)
#* Complete beam configuration (Hovanes) after fixing Active collimator
+
#* Beryllium target installation
#* Detector checkout
+
#** 6:30am, Beam.
#** Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: .
+
#** 7:00am- 7:30am, radcon survey of beamline target area.
#* Low Current 2nA run this afternoon (during Mike's shift)
+
#** 7:30am- 8:00am, Survey & alignment setup
#* Empty target run again overnight?
+
#** 8:00am-8:30am, removing components (Target & start counter)
 +
#** 8:30am, Berylium target installaion by target group (with Imani's presents)
 +
#** Total work duration: 14 hours
 +
#** Currently planned for Monday.
 +
#* A Possibility of mantainace day on Tuesday.

Revision as of 09:47, 18 September 2021

<- Back to Run Coordination Meetings:Summer2021

Tuesday, September 16

  1. Last 24 hours:
  2. Report/issue
  3. Run plan
    • Wait for beam delivery. Begin experiment commissioning. Run plan

Friday, September 17

  1. Last 24 hours:
  2. HARP Scan results: https://logbooks.jlab.org/entry/3906296
  3. Report/issue
    • AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
      • Radcon is escorting Nick into the collimator cave for checking
    • Counting house microphone issue:
      • Improved significantly by the new microphone by Matt
      • A longer USB to micro USB cable will further improve the remote shift experience
  4. Run plan
    • Run plan
    • Complete beam configuration (Hovanes) after fixing Active collimator
    • Detector checkout
      • Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: .
    • Low Current 2nA run this afternoon (during Mike's shift)
    • Empty target run again overnight?

Saturday, September 18

  1. Last 24 hours:
    • AC Fixed at 9:30 am
      • Voltage cable was attached but not locked.
  2. Shift Summary:


  1. Overnight: snake scan.
  2. Present: snake scan ongoing.
      • Radcon is escorting Nick into the collimator cave for checking
    • Counting house microphone issue:
      • Good enough for now. Fin tweak needed. Remote shifters: please give feedback.
  3. Run plan
    • TAGM checkout to be completed (Richard)
    • Beryllium target installation
      • 6:30am, Beam.
      • 7:00am- 7:30am, radcon survey of beamline target area.
      • 7:30am- 8:00am, Survey & alignment setup
      • 8:00am-8:30am, removing components (Target & start counter)
      • 8:30am, Berylium target installaion by target group (with Imani's presents)
      • Total work duration: 14 hours
      • Currently planned for Monday.
    • A Possibility of mantainace day on Tuesday.