*Continue taking production data at 200nA on LHe.
+
*Switch to Empty Target, production data at 200nA.
 
*There have been a couple of beam extended down time over the weekend (overall>24hours), will decide today should we move to empty target
 
*There have been a couple of beam extended down time over the weekend (overall>24hours), will decide today should we move to empty target
 
*from 7:45 meeting -> probably there will be RF recovery on Tuesday during ACC entire day shift
 
*from 7:45 meeting -> probably there will be RF recovery on Tuesday during ACC entire day shift
 
*Solenoid Relief Membrane work (Tuesday), need to ramp dawn magnet to ~800A
 
*Solenoid Relief Membrane work (Tuesday), need to ramp dawn magnet to ~800A

Revision as of 13:57, 19 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

Issues

Plan

  • Take production data at 200nA with Full target
  • Trigger rate scan today ???

Friday, September 16

Past 24 Hours

Issues

Plan

  • Continue taking production data at 200nA with Full target

Saturday, September 17

Past 24 hours

  • Production data at 200nA on the liquid He target.
    • ~3.5B total triggers collected last 24 hours
  • Beam was OFF for ~1pm to 18:10pm, during the down time works been done in hall
    • Sergey replaced some RF modules in FDC
    • Malte fixed 2 FCAL bases
    • Konda worked on GEM-TRD

Issues

Plan

  • Continue taking production data at 200nA on LHe.

Sunday, September 18

Past 24 hours

  • Production data at 200nA on the liquid He target.
    • ???B total triggers collected last 24 hours
  • Beam was OFF for ~12:00pm to 22:30
  • Then from ~05:30 till about 12:00pm
  • After beam is back harp scan was performed
    • RF HPA (transformer) broken

Issues

  • No major issues in the Hall
  • Some Fcal channels were alarming (contacted to Malte)
  • RF issues from ACC site

Plan

  • Continue taking production data at 200nA on LHe.


Monday, September 19

Past 24 hours

  • Production data at 200nA on the liquid He target.
  • Beam was OFF for ~5:30am to 12:00pm
  • After beam is back harp scan was performed

Issues

  • No major issues in the Hall
  • Some Fcal channels were alarming
  • Daq crashed once over the weekend
  • Sergey and Sasha changed Daq configuration to high luminosity mode

Plan

  • Switch to Empty Target, production data at 200nA.
  • There have been a couple of beam extended down time over the weekend (overall>24hours), will decide today should we move to empty target
  • from 7:45 meeting -> probably there will be RF recovery on Tuesday during ACC entire day shift
  • Solenoid Relief Membrane work (Tuesday), need to ramp dawn magnet to ~800A