Difference between revisions of "Run Planning Meeting Notes, September 14 - September 21, 2022"

From GlueXWiki
Jump to: navigation, search
(Sunday, September 18)
Line 84: Line 84:
 
** [https://logbooks.jlab.org/entry/4043041 1000-1600 09/17]
 
** [https://logbooks.jlab.org/entry/4043041 1000-1600 09/17]
 
** [https://logbooks.jlab.org/entry/4043160 1600-2200 09/17]
 
** [https://logbooks.jlab.org/entry/4043160 1600-2200 09/17]
** [ 2200-0400 09/17-09/18]
+
** [https://logbooks.jlab.org/entry/4043226 2200-0400 09/17-09/18]
 
** [ 0400-1000 09/18]
 
** [ 0400-1000 09/18]
  

Revision as of 23:57, 17 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

Issues

Plan

  • Take production data at 200nA with Full target
  • Trigger rate scan today ???

Friday, September 16

Past 24 Hours

Issues

Plan

  • Continue taking production data at 200nA with Full target

Saturday, September 17

Past 24 hours

  • Production data at 200nA on the liquid He target.
    • ~3.5B total triggers collected last 24 hours
  • Beam was OFF for ~1pm to 18:10pm, during the down time works been done in hall
    • Sergey replaced some RF modules in FDC
    • Malte fixed 2 FCAL bases
    • Konda worked on GEM-TRD

Issues

Plan

  • Continue taking production data at 200nA on LHe.

Sunday, September 18

Past 24 hours

  • Production data at 200nA on the liquid He target.
    • ???B total triggers collected last 24 hours
  • Beam was OFF for ~12:00pm to
    • RF HPA (transformer) broken

Issues

  • No major issues in the Hall
  • Some Fcal channels were alarming (contacted to Malte)
  • RF issues from ACC site

Plan

  • Continue taking production data at 200nA on LHe.