Difference between revisions of "Run Planning Meeting Notes, September 14 - September 21, 2022"

From GlueXWiki
Jump to: navigation, search
(Past 24 hours)
(Past 24 hours)
Line 56: Line 56:
 
**~3.5B total triggers collected last 24 hours
 
**~3.5B total triggers collected last 24 hours
 
*Beam was OFF for ~1pm to 18:10pm, during the down time works been done in hall
 
*Beam was OFF for ~1pm to 18:10pm, during the down time works been done in hall
**Sergey replace some RF modules in FDC
+
**Sergey replaced some RF modules in FDC
 
**Malte fixed 2 FCAL bases
 
**Malte fixed 2 FCAL bases
 
**Konda worked on GEM-TRD
 
**Konda worked on GEM-TRD

Revision as of 08:58, 17 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

Issues

Plan

  • Take production data at 200nA with Full target
  • Trigger rate scan today ???

Friday, September 16

Past 24 Hours

Issues

Plan

  • Continue taking production data at 200nA with Full target

Saturday, September 17

Past 24 hours

  • Production data at 200nA on the liquid He target.
    • ~3.5B total triggers collected last 24 hours
  • Beam was OFF for ~1pm to 18:10pm, during the down time works been done in hall
    • Sergey replaced some RF modules in FDC
    • Malte fixed 2 FCAL bases
    • Konda worked on GEM-TRD

Issues

Plan

  • Continue taking production data at 200nA on LHe.