Line 50: Line 50:
  
 
*Continue taking production data at 200nA with Full target
 
*Continue taking production data at 200nA with Full target
 +
 +
=Saturday, September 17=
 +
=== Past 24 hours===
 +
*Production data at 200nA on the liquid He target.
 +
**2.7B total triggers collected last 24 hours
 +
*Beam was OFF for ~1pm to 18:30pm, during the down time works been done in hall
 +
**Sergey replace some RF modules in FDC
 +
**Malte fixed 2 FCAL bases
 +
**Konda worked on GEM-TRD
 +
 +
*Shift summaries:
 +
** [https://logbooks.jlab.org/entry/4042254 0400-1000 09/16]
 +
** [https://logbooks.jlab.org/entry/4042348 1000-1600 09/16]
 +
** [https://logbooks.jlab.org/entry/4042578 1600-2200 09/16]
 +
** [https://logbooks.jlab.org/entry/4042701 2200-0400 09/16-09/17]
 +
** [https://logbooks.jlab.org/entry/4042942 0400-1000 09/17]
 +
 +
=== Issues ===
 
*
 
*
 +
 +
=== Plan ===
 +
*Continue taking production data at 200nA on LHe.

Revision as of 08:46, 17 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

Issues

Plan

  • Take production data at 200nA with Full target
  • Trigger rate scan today ???

Friday, September 16

Past 24 Hours

Issues

Plan

  • Continue taking production data at 200nA with Full target

Saturday, September 17

Past 24 hours

  • Production data at 200nA on the liquid He target.
    • 2.7B total triggers collected last 24 hours
  • Beam was OFF for ~1pm to 18:30pm, during the down time works been done in hall
    • Sergey replace some RF modules in FDC
    • Malte fixed 2 FCAL bases
    • Konda worked on GEM-TRD

Issues

Plan

  • Continue taking production data at 200nA on LHe.