Difference between revisions of "Run Planning Meeting Notes, September 14 - September 21, 2022"
From GlueXWiki
(→Past 24 Hours) |
(→Thursday, September 15) |
||
Line 18: | Line 18: | ||
**Beam restoration expected around 8:00PM | **Beam restoration expected around 8:00PM | ||
**LHe target is FULL at ~2:30pm https://logbooks.jlab.org/entry/4041464 | **LHe target is FULL at ~2:30pm https://logbooks.jlab.org/entry/4041464 | ||
+ | ***Harp Scan https://logbooks.jlab.org/entry/4041653 | ||
*Shift summaries: | *Shift summaries: | ||
Line 27: | Line 28: | ||
=== Plan === | === Plan === | ||
− | + | ||
*Take production data at 200nA with Full target | *Take production data at 200nA with Full target |
Revision as of 07:41, 15 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, September 15
Past 24 Hours
- Maintenance day
- Work done in hall:
- FCAL Base replacement (Malte)
- Installation of setup in PS for GEM-TRD
- Solenoid Relief Membrane was fixed https://logbooks.jlab.org/entry/4041420
- Beam restoration expected around 8:00PM
- LHe target is FULL at ~2:30pm https://logbooks.jlab.org/entry/4041464
- Harp Scan https://logbooks.jlab.org/entry/4041653
- Shift summaries:
Issues
Plan
- Take production data at 200nA with Full target