Run Planning Meeting Notes, September 14 - September 20, 2022

From GlueXWiki
Revision as of 14:32, 14 September 2022 by Aasatury (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

  • Maintenance day
  • Work done in hall:
    • FCAL Base replacement (Malte)
    • Installation of setup in PS for GEM-TRD
    • Beam restoration expected around 8:00PM
  • LHe target was filled ~2:30pm

Issues

Plan

  • Take data on LHe at 200nA after beam is back


Friday, September 16

Past 24 hours

  • Production data at 200nA on the liquid He target.
      • Shift summaries:

Issues

Plan