Difference between revisions of "Run Planning Meeting Notes, September 14 - September 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Wednesday, September 15)
(Thursday, September 15)
Line 12: Line 12:
 
=== Past 24 Hours ===
 
=== Past 24 Hours ===
 
*[https://logbooks.jlab.org/entry/4041273 Maintenance day]
 
*[https://logbooks.jlab.org/entry/4041273 Maintenance day]
 +
* Work done in hall:
 
**FCAL Base replacement (Malte)
 
**FCAL Base replacement (Malte)
 
**Installation of setup in PS for GEM-TRD
 
**Installation of setup in PS for GEM-TRD
Line 31: Line 32:
  
 
* Take data on LHe at 200nA after beam is back
 
* Take data on LHe at 200nA after beam is back
 +
 +
=Friday, September 16=
 +
=== Past 24 hours===
 +
*Production data at 200nA on the liquid He target.
 +
***Shift summaries:
 +
 +
=== Issues ===
 +
 +
=== Plan ===

Revision as of 14:32, 14 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

  • Maintenance day
  • Work done in hall:
    • FCAL Base replacement (Malte)
    • Installation of setup in PS for GEM-TRD
    • Beam restoration expected around 8:00PM
  • LHe target was filled ~2:30pm

Issues

Plan

  • Take data on LHe at 200nA after beam is back

Friday, September 16

Past 24 hours

  • Production data at 200nA on the liquid He target.
      • Shift summaries:

Issues

Plan