Difference between revisions of "Run Planning Meeting Notes, September 14 - September 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Plan)
(Past 24 Hours)
Line 15: Line 15:
 
**Installation of setup in PS for GEM-TRD
 
**Installation of setup in PS for GEM-TRD
 
**Beam restoration expected around 8:00PM
 
**Beam restoration expected around 8:00PM
*Fill LHe target
+
*LHe target was filled ~2:30pm
 
*Take production data at 200nA
 
*Take production data at 200nA
 
**Time spent on LHe target so far: Full
 
**Time spent on LHe target so far: Full
Line 24: Line 24:
 
**  
 
**  
 
**  
 
**  
**  
+
**
  
 
=== Issues ===
 
=== Issues ===

Revision as of 14:25, 14 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Wednesday, September 15

Past 24 Hours

  • Maintenance day
    • FCAL Base replacement (Malte)
    • Installation of setup in PS for GEM-TRD
    • Beam restoration expected around 8:00PM
  • LHe target was filled ~2:30pm
  • Take production data at 200nA
  • Shift summaries:

Issues

Plan

  • Take data on LHe at 200nA after beam is back