Difference between revisions of "Run Planning Meeting Notes, September 14 - September 20, 2022"
From GlueXWiki
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...") |
|||
(9 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
Back to [[Run Coordination Meetings:Fall2022]] | Back to [[Run Coordination Meetings:Fall2022]] | ||
− | = | + | =Thursday, September 15= |
=== Past 24 Hours === | === Past 24 Hours === | ||
− | * | + | *[https://logbooks.jlab.org/entry/4041273 Maintenance day] |
+ | * Work done in hall: | ||
+ | **FCAL Base replacement (Malte) | ||
+ | **Installation of setup in PS for GEM-TRD | ||
+ | **Beam restoration expected around 8:00PM | ||
+ | *LHe target was filled ~2:30pm | ||
+ | |||
**Time spent on LHe target so far: Full | **Time spent on LHe target so far: Full | ||
**[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/ Total triggers collected] | **[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/ Total triggers collected] | ||
Line 19: | Line 25: | ||
** | ** | ||
** | ** | ||
− | ** | + | ** |
+ | |||
+ | === Issues === | ||
+ | |||
+ | === Plan === | ||
+ | |||
+ | * Take data on LHe at 200nA after beam is back | ||
+ | |||
+ | |||
+ | |||
+ | =Friday, September 16= | ||
+ | === Past 24 hours=== | ||
+ | *Production data at 200nA on the liquid He target. | ||
+ | ***Shift summaries: | ||
=== Issues === | === Issues === | ||
=== Plan === | === Plan === | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 14:32, 14 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Thursday, September 15
Past 24 Hours
- Maintenance day
- Work done in hall:
- FCAL Base replacement (Malte)
- Installation of setup in PS for GEM-TRD
- Beam restoration expected around 8:00PM
- LHe target was filled ~2:30pm
- Time spent on LHe target so far: Full
- Total triggers collected
- Shift summaries:
Issues
Plan
- Take data on LHe at 200nA after beam is back
Friday, September 16
Past 24 hours
- Production data at 200nA on the liquid He target.
- Shift summaries: