Difference between revisions of "Run Planning Meeting Notes, September 14 - September 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Wednesday, September 15)
 
(6 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
Back to [[Run Coordination Meetings:Fall2022]]
 
Back to [[Run Coordination Meetings:Fall2022]]
  
=Wednesday, September 15=
+
=Thursday, September 15=
 
=== Past 24 Hours ===
 
=== Past 24 Hours ===
 
*[https://logbooks.jlab.org/entry/4041273 Maintenance day]
 
*[https://logbooks.jlab.org/entry/4041273 Maintenance day]
 +
* Work done in hall:
 
**FCAL Base replacement (Malte)
 
**FCAL Base replacement (Malte)
 
**Installation of setup in PS for GEM-TRD
 
**Installation of setup in PS for GEM-TRD
 
**Beam restoration expected around 8:00PM
 
**Beam restoration expected around 8:00PM
*Fill LHe target
+
*LHe target was filled ~2:30pm
*Take production data at 200nA
+
 
 
**Time spent on LHe target so far: Full
 
**Time spent on LHe target so far: Full
 
**[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/ Total triggers collected]
 
**[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/ Total triggers collected]
Line 24: Line 25:
 
**  
 
**  
 
**  
 
**  
**  
+
**
  
 
=== Issues ===
 
=== Issues ===
Line 30: Line 31:
 
=== Plan ===
 
=== Plan ===
  
** Take data on LHe at 200nA
+
* Take data on LHe at 200nA after beam is back
 +
 
 +
 
 +
 
 +
=Friday, September 16=
 +
=== Past 24 hours===
 +
*Production data at 200nA on the liquid He target.
 +
***Shift summaries:
 +
 
 +
=== Issues ===
 +
 
 +
=== Plan ===

Latest revision as of 14:32, 14 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 15

Past 24 Hours

  • Maintenance day
  • Work done in hall:
    • FCAL Base replacement (Malte)
    • Installation of setup in PS for GEM-TRD
    • Beam restoration expected around 8:00PM
  • LHe target was filled ~2:30pm

Issues

Plan

  • Take data on LHe at 200nA after beam is back


Friday, September 16

Past 24 hours

  • Production data at 200nA on the liquid He target.
      • Shift summaries:

Issues

Plan