(Friday, Sep 28 at 08:45)
Line 2: Line 2:
  
 
<!--  * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment -->  
 
<!--  * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment -->  
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet]
+
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] Started Filling out on 9/28/18
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]

Revision as of 07:20, 28 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Collected 'production' data overnight, concerned about quality cobrems gui
  2. CEBAF:
  3. Action Items:
    • Update reference plots
  4. Issues:
    • Beam
    • Network problems
    • Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui
  5. Reports:
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB