Difference between revisions of "Run Planning Meeting Notes, Sep 12-19, 2018"
From GlueXWiki
(→Tuesday, Sep 18 at 08:45) |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 6: | Line 6: | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | == Wednesday, Sep 19 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #CEBAF: | ||
+ | #* Previously observed obstruction in NL is gone, probably nitrogen ice | ||
+ | #* Beam at 5R | ||
+ | #* CW for Hall C on Thursday, other halls Friday swing | ||
+ | #Action Items: | ||
+ | #* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 8% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">91% not ready </span> | ||
+ | #Issues | ||
+ | # Reports: | ||
+ | # Run Plan | ||
+ | # AOB | ||
== Tuesday, Sep 18 at 08:45 == | == Tuesday, Sep 18 at 08:45 == |
Latest revision as of 06:52, 20 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Wednesday, Sep 19 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Previously observed obstruction in NL is gone, probably nitrogen ice
- Beam at 5R
- CW for Hall C on Thursday, other halls Friday swing
- Action Items:
- Hot Check OUT Status 8% ready ; 1% checked ; 91% not ready
- Issues
- Reports:
- Run Plan
- AOB
Tuesday, Sep 18 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- NL is up, obstruction/aperture tests today
- SL will be brought up today
- Action Items:
- Hot Check OUT Status 0% ready ; 1% checked ; 99% not ready
- Issues
- Reports:
- Run Plan
- AOB