Difference between revisions of "Run Planning Meeting Notes, Sep 12-19, 2018"

From GlueXWiki
Jump to: navigation, search
(Created page with "<- Back to Run Coordination Meetings:Fall2018 Run <!-- * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment -...")
 
 
(5 intermediate revisions by 2 users not shown)
Line 6: Line 6:
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
  
 +
== Wednesday, Sep 19 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#CEBAF:
 +
#* Previously observed obstruction in NL is gone, probably nitrogen ice
 +
#* Beam at 5R
 +
#* CW for Hall C on Thursday, other halls Friday swing
 +
#Action Items:
 +
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 8% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">91% not ready  </span>
 +
#Issues
 +
# Reports:
 +
# Run Plan
 +
# AOB
  
 
== Tuesday, Sep 18 at 08:45 ==
 
== Tuesday, Sep 18 at 08:45 ==
Line 14: Line 26:
 
#* NL is up, obstruction/aperture tests today
 
#* NL is up, obstruction/aperture tests today
 
#* SL will be brought up today
 
#* SL will be brought up today
#Issues:
+
#Action Items:
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Checkout]
+
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 0% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">99% not ready  </span>
 +
#Issues
 
# Reports:
 
# Reports:
 
# Run Plan
 
# Run Plan
 
# AOB
 
# AOB

Latest revision as of 06:52, 20 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Wednesday, Sep 19 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • Previously observed obstruction in NL is gone, probably nitrogen ice
    • Beam at 5R
    • CW for Hall C on Thursday, other halls Friday swing
  3. Action Items:
  4. Issues
  5. Reports:
  6. Run Plan
  7. AOB

Tuesday, Sep 18 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • NL is up, obstruction/aperture tests today
    • SL will be brought up today
  3. Action Items:
  4. Issues
  5. Reports:
  6. Run Plan
  7. AOB