Difference between revisions of "Run Planning Meeting Notes, Sep 12-19, 2018"

From GlueXWiki
Jump to: navigation, search
(Tuesday, Sep 18 at 08:45)
(Tuesday, Sep 18 at 08:45)
Line 15: Line 15:
 
#* SL will be brought up today
 
#* SL will be brought up today
 
#Action Items:
 
#Action Items:
#* # [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 0% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">99% not ready  </span>
+
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 0% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">99% not ready  </span>
 
#Issues
 
#Issues
 
# Reports:
 
# Reports:
 
# Run Plan
 
# Run Plan
 
# AOB
 
# AOB

Revision as of 08:34, 18 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Tuesday, Sep 18 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • NL is up, obstruction/aperture tests today
    • SL will be brought up today
  3. Action Items:
  4. Issues
  5. Reports:
  6. Run Plan
  7. AOB