Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, October 11)
Line 1: Line 1:
 +
=Tuesday, October 12=
 +
# In last 24 hours:
 +
#** Early Riser:
 +
#** Owl summary:
 +
#** Swing summary:
 +
#** Day summary:
 +
# Issues:
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
 
=Monday, October 11=
 
=Monday, October 11=
 
#In last 72 hours:
 
#In last 72 hours:

Revision as of 09:39, 11 October 2021

Tuesday, October 12

  1. In last 24 hours:
      • Early Riser:
      • Owl summary:
      • Swing summary:
      • Day summary:
  2. Issues:
  3. Plan:

Monday, October 11

  1. In last 72 hours:
  2. Issues:
  3. Plan:
    • Reference plots needs to be updated
    • No beam between 4pm and 9pm (tentavily) <= Hall A is not ready yet
    • Ramp up solenoid at 4pm
    • Once ramp up and beam back calibration (1.2 shift) of
      • CDC
      • FDC
    • Empty or target fill will be decided at 4 pm by the PIs

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • Hall A will be back online Monday morning
    • Tuesday Beam study / RF recovery will probably be postponed to a later day

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn