Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 8)
(Friday, October 8)
Line 15: Line 15:
 
#* FCAL suspicious channels https://logbooks.jlab.org/entry/3919561  
 
#* FCAL suspicious channels https://logbooks.jlab.org/entry/3919561  
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* 100 nA (2 shifts)
 
#* Turn the magnet on and ramp to low current (50A)
 
#* Turn the magnet on and ramp to low current (50A)
 
#* If Hall A is back online today  
 
#* If Hall A is back online today  

Revision as of 07:36, 8 October 2021

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • If Hall A is back online today
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn