Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 8)
(Friday, October 8)
Line 8: Line 8:
 
#* Updated Documentation on myaPlot https://logbooks.jlab.org/entry/3919509 (Elton)
 
#* Updated Documentation on myaPlot https://logbooks.jlab.org/entry/3919509 (Elton)
 
#* 0.2B triggers at 200 nA
 
#* 0.2B triggers at 200 nA
 +
#* Production rate scan https://logbooks.jlab.org/entry/3919648 (Sasha)
 
#* CCAL LEDs, 200 nA and 50 nA https://logbooks.jlab.org/entry/3919571 (Sasha)
 
#* CCAL LEDs, 200 nA and 50 nA https://logbooks.jlab.org/entry/3919571 (Sasha)
 
#* BCAL run, 81418, with TPOL converter retracted, 200 nA & PRIMEX/PHYSICS cfg https://logbooks.jlab.org/entry/3919569 (Elton/Mark)
 
#* BCAL run, 81418, with TPOL converter retracted, 200 nA & PRIMEX/PHYSICS cfg https://logbooks.jlab.org/entry/3919569 (Elton/Mark)

Revision as of 17:40, 7 October 2021

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Turn the magnet on and ramp to low current (50A)
    • If Hall A is back online today
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn