Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday, October 7)
(Thursday, October 7)
Line 16: Line 16:
 
#* Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 (Elton)
 
#* Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 (Elton)
 
#* LED skim, https://logbooks.jlab.org/entry/3918989
 
#* LED skim, https://logbooks.jlab.org/entry/3918989
 +
#* Camera https://logbooks.jlab.org/entry/3918788
 
#* Bleedthrough [https://logbooks.jlab.org/entry/3918952 Different Beam structure after target change] (Tuesday evening)
 
#* Bleedthrough [https://logbooks.jlab.org/entry/3918952 Different Beam structure after target change] (Tuesday evening)
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]

Revision as of 08:41, 7 October 2021

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 100 kHz random pulser, HallD laser turn off, and no beam for 40mn