Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday, October 7)
(Thursday, October 7)
Line 19: Line 19:
 
#* 200 nA CDC & FDC turn off (3 shifts)
 
#* 200 nA CDC & FDC turn off (3 shifts)
 
#* 100 nA CDC & FDC turn off (2 shifts)
 
#* 100 nA CDC & FDC turn off (2 shifts)
#* If Hall A is back online today (possible but not expected)
+
#* MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
 +
#* If Hall A is back online today (unlikely most probably tomorrow)
 
#** Check radiation
 
#** Check radiation
 
#** HARP scan
 
#** HARP scan
 
#** Bleedthrough run with 100 kHz random pulser, HallD laser turn off, and no beam for 40mn
 
#** Bleedthrough run with 100 kHz random pulser, HallD laser turn off, and no beam for 40mn

Revision as of 08:05, 7 October 2021

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 100 kHz random pulser, HallD laser turn off, and no beam for 40mn