Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday, October 7)
(Thursday, October 7)
Line 5: Line 5:
 
#* Swing summary: https://logbooks.jlab.org/entry/3919178
 
#* Swing summary: https://logbooks.jlab.org/entry/3919178
 
#* Day summary: https://logbooks.jlab.org/entry/3918973
 
#* Day summary: https://logbooks.jlab.org/entry/3918973
 +
#* Target cooled down and filled with liquid He4
 
#* HallD cavity BPM calibration, https://logbooks.jlab.org/entry/3919129
 
#* HallD cavity BPM calibration, https://logbooks.jlab.org/entry/3919129
 
#* Gas bottle changed, https://logbooks.jlab.org/entry/3919183 (Elton)
 
#* Gas bottle changed, https://logbooks.jlab.org/entry/3919183 (Elton)

Revision as of 20:37, 6 October 2021

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan: