Run Planning Meeting Notes, October 20 - October 26, 2022
From GlueXWiki
Revision as of 08:12, 20 October 2022 by Aasatury (Talk | contribs) (Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...")
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Wednesday, October 20
Past 24 hours
- Beam was Off most of the day starting from ~7:30am for "ARW Tour and Associated Maintenance" and VCG1L1210(SRF Insulating Vacuum)
- During dawn time Mark and Malte replaced some Fcal bases (2?)
- Vlad and Arshak did some alignment on the prototype
- Kondo conducted some work on GEM-TRD
- Restored Beam to the Hall-D at ~22:30, after 15 hours of downtime
- After Beam restoration Harp Scan was performed and started run on the Empty LHe4 Cell target with 200nA
- Collected for about 0.3B events
- At 7:45 meeting informed MCC about beam position instability
- Shift Summary
Issues
Plan
Continue running on the Empty target at 200nA