Difference between revisions of "Run Planning Meeting Notes, October 20 - October 26, 2022"

From GlueXWiki
Jump to: navigation, search
(Thursday, October 21)
(Wednesday, October 20)
Line 44: Line 44:
  
  
* Shift Summary
+
=== Shift Summary ===
 
** [https://logbooks.jlab.org/entry/4063182 Day Oct-19]
 
** [https://logbooks.jlab.org/entry/4063182 Day Oct-19]
 
** [https://logbooks.jlab.org/entry/4063459 Swing Oct-19]
 
** [https://logbooks.jlab.org/entry/4063459 Swing Oct-19]

Revision as of 21:58, 20 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, October 21

Past 24 hours

  • Continued taking data at 200nA with EMPTY Target Cell till ~14:00, collected ~0.65B events, overall collected data for past period 1.533B events
  • 15:00 Beam was OFF for ~3.5 hours for Injector Restoration
  • At 16:10 started filling the target with LHe
  • ~17:40 Beam was back, started collecting data with 200nA and FULL target
  • 17:58 FDC:hv:2:c3:3n channel HV tripped, tried to turn it ON, with different ways, but continuously it was tripping, contacted to Lubomir he changed the HV from 500V to 400V [1]
  • 19:20 Target alarm comes ON, the Pulse Tube Refrigerator(PTR) was switched off resulting in increase of the target cell temperatures from 4.27 to about 4.6 K
  • Same Target Issue happened at 20:50 again, switched back ON the PTR, and in both cases contacted to Chris Carlin, he will keep an eye on it

Shift Summary

Issues

Plan

Continue running on the FULL LHe target at 200nA

Wednesday, October 20

Past 24 hours

  • Beam was Off most of the day starting from ~7:30am for "ARW Tour and Associated Maintenance" and VCG1L1210(SRF Insulating Vacuum)
    • During dawn time Mark and Malte replaced some Fcal bases (2?)
    • Vlad and Arshak did some alignment on the prototype
    • Kondo conducted some work on GEM-TRD
  • Restored Beam to the Hall-D at ~22:30, after 15 hours of downtime
  • After Beam restoration Harp Scan was performed and started run on the Empty LHe4 Cell target with 200nA
  • Collected for about 0.3B events
  • At 7:45 meeting informed MCC about beam position instability


Shift Summary

Issues

Plan

Continue running on the Empty target at 200nA