Difference between revisions of "Run Planning Meeting Notes, Oct 4-Oct 10, 2018"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
== Friday, Oct 5 at 08:45 ==
 
== Friday, Oct 5 at 08:45 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 +
#*
 
#CEBAF:
 
#CEBAF:
 
#Action Items:
 
#Action Items:
#* Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
+
#* [https://logbooks.jlab.org/entry/3604336 target alarm thresholds]
#* Hodoscope module playing up
+
#* [https://halldweb.jlab.org/work/halld2/data_monitoring/RunPeriod-2018-08/rawdata_ver00/Run050750/HistMacro_OnlineTagger.png Hodoscope module]
 
#Issues:  
 
#Issues:  
 
# Reports:
 
# Reports:

Revision as of 23:19, 4 October 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Friday, Oct 5 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
  3. Action Items:
  4. Issues:
  5. Reports:
    • Monitoring
  6. Run Plan:
    • Week 3 Week 4
    • Friday
      • TAC run
        • Hall C will be down from 7am for 6-8h
        • MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
    • Weekend and longer term
      • Microscope threshold scan
      • High rate tests of L1 trigger and DAQ
      • Rate comparison test
      • RF Recovery on Tuesday, who needs an access?
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB

Thursday, Oct 4 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • PSS trip in North Linac
    • Hall C will ramp up to 60uA end of day shift/start of swing
  3. Action Items:
  4. Issues:
    • Cigarette butts in the indoor trash - don't!
  5. Reports:
    • Monitoring
  6. Run Plan:
    • Week 2 Week 3 Week 4
    • Thursday
      • 0930 access
        • TAC run preparation, Hovanes with ARM to install the Pb converter
        • Parallel (rapid) access for Beni (CDC) and Tim (PS). Others?
        • Radcon repair to radiation monitor to fix the alarm in counting room
      • Hovanes will calibrate A.C. high gain setting (am, after access)
    • Friday
      • TAC run
        • Hall C will be down from 7am for 6-8h
        • MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
    • Weekend and longer term
      • High rate tests of L1 trigger and DAQ
      • Rate comparison test
      • RF Recovery on Tuesday, who needs an access?
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB