Difference between revisions of "Run Planning Meeting Notes, Oct 4-Oct 10, 2018"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
 
# Run Plan:  
 
# Run Plan:  
 
#* [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Week 2] [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4]
 
#* [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Week 2] [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4]
#*TAC run prep on Thursday
+
#* 0930 access
#** 0930 Quick access for Hovanes with ARM to install the Pb converter;  also remember to call Melvin from radcon to fix the alarm (number on whiteboard & alarm)
+
#**TAC run preparation, Hovanes with ARM to install the Pb converter
 +
#**Parallel (rapid) access for Beni (CDC) and Tim (PS)
 +
#**Radcon repair to radiation monitor to fix the alarm in counting room
 
#** Hovanes will calibrate A.C. high gain setting on Thurs am.
 
#** Hovanes will calibrate A.C. high gain setting on Thurs am.
 
#*TAC run on Friday
 
#*TAC run on Friday

Revision as of 16:36, 3 October 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Wednesday, Oct 3 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
  3. Action Items:
    • Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
    • Definition of nominal coherent peak energy
  4. Issues:
    • placeholder
  5. Reports:
    • Monitoring
  6. Run Plan:
    • Week 2 Week 3 Week 4
    • 0930 access
      • TAC run preparation, Hovanes with ARM to install the Pb converter
      • Parallel (rapid) access for Beni (CDC) and Tim (PS)
      • Radcon repair to radiation monitor to fix the alarm in counting room
      • Hovanes will calibrate A.C. high gain setting on Thurs am.
    • TAC run on Friday
      • Hall C will be down from 7am for 6-8h
      • MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of single-hall time).
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB