#* Keep taking data over the weekend | #* Keep taking data over the weekend | ||
− | #* | + | #* No requests for additional tests/checks/measurements so far |
#* Accel. | #* Accel. | ||
#** Beam studies on Monday | #** Beam studies on Monday | ||
#** RF recovery on Tuesday | #** RF recovery on Tuesday | ||
# AoB | # AoB | ||
− | #* | + | #* No meeting during weekend |
== Thursday, Oct 25 at 08:45 == | == Thursday, Oct 25 at 08:45 == |
Revision as of 09:03, 26 October 2018
Friday, Oct 26 at 08:45
- Last 24h
- Shifts were on standby until 8pm
- Hall went into beam permit ~8:30pm
- Filled target, performed harp scans, checked radiation levels
- Started taking data with AMO ~10:40pm
- Cycled through the production sequence
- Collected ~800M Evts so far
- Issues and current Status
- Minor DAQ crashes
- No beam for ~15min, 1L22-7 tripped
- Data taking runs smoothly right now
- Reports
- Plans
- Keep taking data over the weekend
- No requests for additional tests/checks/measurements so far
- Accel.
- Beam studies on Monday
- RF recovery on Tuesday
- AoB
- No meeting during weekend
Thursday, Oct 25 at 08:45
- Last 24h
- Took data with 180nA beam until 9:00am
- Emptied target, coll. to block, gon. to blank
- FCAL Base replacements
- Issues and current Status
- Hall is in controlled access
- Accell.
- Extended phaser studies/tests into swing-shift
- Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
- Earliest to expect beam: Around owl-shift (i.e. Friday)
- Reports
- Plans
- Today
- Work in hall (stay in controlled access)
- BCAL (Elton)
- TOF (Beni)
- Walk through(s)
- Shifts are on standby until 11:59pm today
- IF beam is back:
- Fill target, perform harp scans, check radiation levels, PS-rates,...
- Start data taking with AMO @ 180nA
- Work in hall (stay in controlled access)
- Upcoming days
- Take data as soon as beam is available
- Accel.
- Beam studies on Monday
- RF recovery for Tuesday, need to re-tune one of the cavitis
- Today
- AoB