Difference between revisions of "Run Planning Meeting Notes, Oct 25-Oct 31, 2018"

From GlueXWiki
Jump to: navigation, search
(Thrusday, Oct 25 at 08:45)
(Thrusday, Oct 25 at 08:45)
Line 1: Line 1:
== Thrusday, Oct 25 at 08:45 ==
+
== Thursday, Oct 25 at 08:45 ==
 
# Last 24h
 
# Last 24h
# Issues
+
#* Took data with 180nA beam until 9:00am
 +
#* Emptied target, coll. to block, gon. to blank
 +
#*[https://logbooks.jlab.org/entry/3614677 FCAL Base replacements]
 +
# Issues and current Status
 +
#* Hall is in controlled access
 +
#* Accell.
 +
#** Extended phaser studies into swing-shift
 +
#** Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
 +
#* Earliest to expect beam: Around owl-shift (i.e. Friday)
 
# Reports
 
# Reports
 +
#* [https://logbooks.jlab.org/entry/3614696 Monitoring]
 +
#* [https://logbooks.jlab.org/entry/3614497 Rates in TAC run]
 
# Plans
 
# Plans
 +
#* Today
 +
#** Work in hall? Go into restricted access?
 +
#** Set shifts on standby until 8:00am tomorrow?
 +
#* Upcoming days
 +
#** Take data as soon as beam is available
 +
#** Accel. plans RF recovery for Tuesday, need to re-tune one of the cavitis
 
# AoB
 
# AoB

Revision as of 08:35, 25 October 2018

Thursday, Oct 25 at 08:45

  1. Last 24h
  2. Issues and current Status
    • Hall is in controlled access
    • Accell.
      • Extended phaser studies into swing-shift
      • Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
    • Earliest to expect beam: Around owl-shift (i.e. Friday)
  3. Reports
  4. Plans
    • Today
      • Work in hall? Go into restricted access?
      • Set shifts on standby until 8:00am tomorrow?
    • Upcoming days
      • Take data as soon as beam is available
      • Accel. plans RF recovery for Tuesday, need to re-tune one of the cavitis
  5. AoB