Difference between revisions of "Run Planning Meeting Notes, Novemver 17 - Novemver 23, 2022"

From GlueXWiki
Jump to: navigation, search
(Issues/Reports)
(Issues/Reports)
Line 26: Line 26:
  
 
* 2.5B collected since the start of this Full target cycle (111456-present)
 
* 2.5B collected since the start of this Full target cycle (111456-present)
* [FCAL base lock https://logbooks.jlab.org/entry/4084969]
+
* [https://logbooks.jlab.org/entry/4084969 FCAL base lock]
 +
* CDC IA was not turn on after the target was filled
  
 
=== Plan ===
 
=== Plan ===

Revision as of 23:02, 16 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, November 17

Past 24 hours

  • 1.5B collected (111460-present)
  • DAQ issue

Shift Summary

Issues/Reports

  • 2.5B collected since the start of this Full target cycle (111456-present)
  • FCAL base lock
  • CDC IA was not turn on after the target was filled

Plan