Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Friday November 05) |
(→Friday November 05) |
||
Line 10: | Line 10: | ||
#* Recorded 800M+ events with full lHe4 target | #* Recorded 800M+ events with full lHe4 target | ||
#* 8am: PrimEx EoR | #* 8am: PrimEx EoR | ||
− | #Issues: | + | #Issues: - |
+ | # Reports: | ||
+ | #* Normalized rates [https://logbooks.jlab.org/entry/3937372] and beam energy [https://logbooks.jlab.org/entry/3937380](Alexandre) | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
#* Beam energy change 11/05-11/07, start Friday 8am | #* Beam energy change 11/05-11/07, start Friday 8am |
Revision as of 08:38, 5 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Friday November 05
- Last 24h:
- Issues: -
- Reports:
- Plan:
- Beam energy change 11/05-11/07, start Friday 8am
- Cancel shifts from Friday 10am?
- RadCon survey for tagger halld done at 8am, leave hall and tagger in controlled
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- Installation of Youri's detector near the PS on Sunday, calorimeter test has to go today?
- Maintenance of the A/C for the server room: shut off for more than 10min, ramp down servers?
- Start SRC/CT experiment on Monday
- Wiki page
- Morning meeting at same time, but new number: 497773790/1473
- Do we want to start a new run period 2021-11?
- Continue SRC/CT run plan discussion here
- Beam energy change 11/05-11/07, start Friday 8am
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am